Tonlos more work welches scheduled to complete the Elster-Saale canal. Such a move would allow small boats to reach the Elbe from Leipzig. The intended completion date has been postponed because of an unacceptable cost-benefit ratio. [51] This bombing was the largest up to that time. Due to the close proximity of many of the buildings hit, a fir